The software development lifecycle (SDLC) is the order a team works in to turn an idea into software people use: plan, design, build, test, deploy, maintain, then round again. Skipping a step rarely saves time. It moves the cost to a later phase, where the same fix is more expensive.
Why follow a lifecycle
Starting with code feels fast. The trouble shows up later, as a feature nobody asked for or a database that can't hold the data the app needs. Each of those is a question that should have been answered earlier.
The SDLC gives every question a home. Who the app is for gets settled in planning, how its data flows in design, and whether it works in testing. When everyone on the team knows which phase a piece of work is in, they know what 'done' means for it and what has to happen next.
Different sources split the SDLC into five, six or seven phases (some pull 'requirements' out of planning into a phase of its own), but the shape is the same.
The six phases
Plan
Planning decides what to build and whether it's worth building. The outputs are a clear problem statement, the people it's for, a rough scope, and an estimate of time and cost. This is also where you write down requirements: what the software must do ('a user can cancel a booking up to 24 hours before') and how well it must do it ('pages load in under two seconds on a phone').
A good plan says what is out of scope too. That list is what stops a two-month project turning into a six-month one.
Design
Design turns requirements into decisions, before any production code exists. Teams sketch the screens, choose the architecture (one service or several, which database, where it runs), and work out how data moves through the system, from what the browser sends to what the server stores and returns.
Design is cheap to change. Moving a box on a whiteboard takes seconds; reshaping a database table that already holds a year of user data can take weeks. That gap is the main reason the phase exists.
Build
Build is where code gets written: the features and the tests that go with them. In a healthy team this happens in small pieces, each reviewed by another developer before it is merged, so problems are caught while the change is still fresh.
Wondering how this was made? How we make these